From:                              route@monster.com

Sent:                               Thursday, April 07, 2016 11:54 AM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: p6 Scheduler

 

This resume has been forwarded to you at the request of Monster User xapeix03

Asa Monk 

Last updated:  06/08/15

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Liberty, TX  77575
US

Home: 9366410385   
champace93@hotmail.com

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Asa Monk - Lead Scheduler

Resume Value: jb4cde2ztxwykbxd   

  

 

Asa Monk

936-641-0385

Champace93@hotmail.com

 

 

Summary

While working to learn new systems and processes that were required for each project, I have acquired knowledge in small and large Capital Projects, Maintenance Turnarounds, Project Management, Cost Control, Planning and Engineering. In the process of building and executing these schedules I produced reports and analytics for my employer and contract or client needs regarding all aspects of cost and schedule progress or development. My assignments have ranged from small turnarounds to large Capital Projects into the billion dollar range. I have worked with multiple logically integrated schedules as well as multiple subcontractors. I have managed teams through development and execution throughout my career and welcome the chance to work with people driven to success.

 

Project-T/A Experience

 

Zachry Industrial

Katy/Sweeny, TX                             11/2013-Present

CPChem Gulf Coast Polyethelyne Project/SIT (Storage in Transit) Project

Project Schedule Manager/Lead Scheduler

 

CPChem- I have been the Project Scheduling Manager and lead scheduler for the development and execution of the 2.7 billion dollar investment CPChem made to design and construct a Greenfield polyethylene facility project in Sweeny, TX. and Storage in Transit facility. Working closely with the client my team and I developed a full EPC schedule with our engineering partner Technip to develop the polyethylene schedule. The SIT schedule was developed with Zachry Engineering of Omaha and several smaller third party engineering partners. Multiple logically tied schedules were needed based on the complexity of these projects. Several project baselines were created and used as the development of these schedules continued. Although cost was not directly integrated into this particular schedule, man-hours actual and earned were reported to our cost department and the client and used to fulfill our cost reporting requirements.

 

·   Formalized a documented process for schedule development for all phases of the project initiative

·   Managed a team of 4 schedulers assigned to specific areas within the project

·   Chaired schedule update meetings with crafts and management of all levels for the client and employer

·   Developed schedules through a leveled process 1-4, level 1 being our Major Milestone /High Level Activity schedule and level 4 being our final execution schedule

·   Worked with contractors and Project Managers to insure completion of projects scope on schedule and within budget

·   Worked closely with planning managers and planners to develop our scope and schedule

·   Maintained multiple project baselines and created analysis against the data (variances and Fuse reports)

·   Utilized Qtrax planning system for collection of planned data and actualized man-hours

·   Development of a standard WBS structure

·   Used Excel extensively to track planning and schedule through execution

·   Extensively worked with operations and safety to produce Pre-Commissioning and Shutdown/Start-up processes

·  Utilized Acumen Fuse/Risk for schedule risk and schedule competence

 

Dow Chemical

Hahnville, La                             12/2012-Present

Dow/UCC Chemical Complex Saint Charles Operations

Lead Scheduler for Turnaround Execution

 

Dow- At I was lead scheduler for turnaround execution. Dow would execute up to 12 turnarounds per year that were divided between 3 schedulers depending on the manpower requirements each present. I was responsible for all aspects of the schedule from initiation to close out.

 

·   Formalized and documented process for schedule development for all phases of a T/A initiative

·   Chaired schedule update meetings with crafts and management of all levels

·   Developed schedules through a leveled process 1-4, level 1 being our Major Milestone /High Level Activity schedule and level 4 being our final execution schedule

·   Provided reports to the plant directors and managers

·   Worked with contractors and Project Managers to insure completion of projects scope on schedule and within budget

·   Utilized GEMTs planning system for collection of planned data for T/A and modification/maintenance of plans

·   Development of a standard WBS structure

·   Worked with multiple integrated schedules

·   Used Excel extensively to track planning and schedule through execution

·   Extensively worked with operations and safety to produce Shutdown/Start-up processes

 

TEPCO-Team Enterprise Project Controls Organization

Baytown, TX                              4/2011-11/2012

Bayer Baytown Chemical Complex

Lead Scheduler for Implementation Process and Turnaround Execution

 

Bayer- I was lead for implementation of a formal turnaround scheduling process. Including the development of a WBS system and the execution of these processes for the largest T/A for Bayer in a decade.

 

·   Formalized and documented process for schedule development for all phases of a T/A initiative

·   Implementation/Administration of progress tracking software for T/A development (Navitrack)

·   Chaired schedule update meeting with foreman and supervisors for purposes of updating progress

·   Extensively utilized MS Project as well as Primavera 8.0 to schedule and track

·   Developed schedules through a leveled process 1-4, level 1 being our Major Milestone /High Level Activity schedule and level 4 being our final execution schedule

·   Provided reports to the plant directors and managers

·   Built a standard schedule from conception through commissioning for all Units within the plant.

·   Worked with contractors and Project Managers to insure completion of projects scope on schedule and within budget

·   Developed schedule management plans and premise which outline how the schedule must be developed and carried out through all phases

·   Involved in development of estimates for all phases of T/A from conceptual to post T/A execution

·   Utilized Bayer proprietary planning system for collection of planned data for T/A and modification/maintenance of plans

·   Development of a standard WBS Structure for Bayer Baytown

·   Extensively worked with operations and safety to produce processes and a schedule with great consideration to the highly dangerous chemicals namely Phosgene

 

TEPCO-Team Enterprise Project Controls Organization

Pasadena, TX                              11/2008-4/2011

Pasadena Refining System Inc/Petrobras America

Lead Engineering Scheduler-Capital Projects Scheduler

 

PRSI- My position at PRSI was to develop and track schedules for the Capital projects group as well as to assist with management aspects among our 50+ projects in various stages of development and execution.

 

·   Built and maintained Engineering, Capital Projects, and construction schedules for the plant

·   Worked with engineering firms to schedule deliverables for engineering and construction

·   Chaired schedule update meeting with foreman and supervisors for purposes of updating progress

·   Extensively utilized MS Project as well as Primavera 6.0 and 6.2 to schedule multiple needs within the plant

·   Planned and supervised projects for the construction group

·   Provided monthly reports to the plant directors and managers

·   Built a standard engineering template for projects at each level of budgeting outlining the timetable from conception through commissioning.

·   Requisitioning for the capital group and maintenance

·   Active in cost control, planning, and management

·   Utilized Excel in our reporting processes

 

Zachry Capital Projects/ Zachry Industrial Services

Pasadena, TX                                   09/2007-11/2008

Chevron Phillips CPC

Capital Projects Scheduler-Maintenance Scheduler

 

Chevron/Phillips Pasadena Plastics Complex-At CPC I was initially the small turnaround scheduler. This position allowed me to transition to a lead role for all turnarounds and Capital Projects execution scheduling as well as daily maintenance scheduling in SAP.

 

·   Built and maintained projects schedule for entire Zachry Maintenance, Capital, and Engineering contract with Chevron Phillips.

·   Utilized SAP to gather work orders and planning information for use in building turnaround schedules and Capital Projects.

·   Chaired schedule update meeting with foreman and supervisors for purposes of updating progress

·   Helped other scheduler with T/A efforts and scheduling for spring T/A  with many different contractors

·   Spent time in the field working to gather updates and progress work and learn equipment Shutdown/Start-up procedures with Operations

·   Utilized Excel in creating and running T/A visual daily reports for tracking of T/A and Capital Projects

·   Worked with client on matching P5 to SAP for budgeting purposes and analysis

·   Worked with Engineering to track and progress of current projects through all phases of development

·   Awarded the lead scheduler position for all T/A and Capital Projects activity

·   Scheduled daily maintenance through SAP

·   Used cost tracking software to ensure proper budget management with all aspects of work in plant

 

Zachry Maintenance

Deer Park, TX                                   01/2007-09/2007

Rohm and Haas

Maintenance Project Scheduler

 

Rohm and Hass La Porte Plant- My position was to create/execute the schedule for small turnarounds. I also developed a front end process for turnaround planning and development.

 

·   Built and progressed a turnaround schedule for Primene and P-North units

·   Utilized SAP to gather work orders and planning information for use in building turnaround schedules

·   Chaired schedule update meeting with foreman and supervisors

·   Built standard milestone schedule for use in tracking pre-turnaround planning progress

·   Assisted with planning of T/A  scope for B4 and HR units

·   Managed indirect cost and tracking.

·   Worked with cost controls to ensure proper tracking and budget compliance.

·   Completed extensive training in processes within plant

 

 

Software, Skills, Training

 

·   SAP for cost and planning

·   Qtrax planning Software

·   Acumen Fuse/Risk

·   Maximo (Cost and Req. Software)

·   GEMTs (Planning, Cost, Req. , Software)

·   P3.1 project planner (Primavera)

·   P5 or P3e  Project Planner (Primavera)

·   P6.0 and 6.2 Scheduling software (Primavera)

·   P7- P8 (Primavera)

·   Oracle based Primavera applications

·   MS Project

·   TWIC-Transportation Worker Identification Credential

·   Houston Area Safety Council

·   Primavera 601 Training for 3.1

·   Primavera 602 Training for 3.1

·   AP Networks Tools- Navitrack

·   Basic blue print reading

·   Microsoft Office Tools (Word, Power Point)

·   Good to Strong MS Excel experience

·   Pertmaster Job analyzer (Limited use)

·   Omni Search Retrieval 3.0 (Library of PLEDs and MF drawings)

 

References upon request:

 

 

1 of 3



Experience

BACK TO TOP

 

Job Title

Company

Experience

Lead Scheduler

Chevron/ Phillips/Zachry

- Present

 

Additional Info

BACK TO TOP

 

Current Career Level:

Experienced (Non-Manager)

Work Status:

US - I am authorized to work in this country for any employer.

Active Security Clearance:

None

US Military Service:

Citizenship:

US citizen

 

 

Target Job:

Target Job Title:

Lead Scheduler

Desired Job Type:

Employee
Temporary/Contract/Project

Desired Status:

Full-Time

 

Target Company:

Company Size:

Occupation:

Manufacturing/Production/Operations

·         Operations/Plant Management

·         Production/Operations Planning

Project/Program Management

·         Project Management

 

Target Locations:

Selected Locations:

US-TX-Houston

Relocate:

Yes

Willingness to travel:

Up to 25% travel